| 2001 №09 (06) | 2001 №09 (08) |
The Paton Welding Journal, 2001, #9, 30-32 pages
Inspection and testing of welding equipment serial-produced by Company «SELMA» and its conformity to requirements of DSTU ISO 9001-95 (fragments of the quality system)
E.A. Kopilenko1, G.V. Pavlenko1, T.I. Samokhina1, N.V. Chmykhov1, V.I. Yumatova2
1OJSC Electric Machine-Building Plant «SELMA», Simferopol, Ukraine2E.O. Paton Electric Welding Institute of the NASU 11 Kazymyr Malevych Str., 03150, Kyiv, Ukraine.
Abstract
Experience of work of OJSC Electric Machine-Building Plant "SELMA" in the field of inspection and testing of serial-produced welding equipment and assurance of its conformity to the requirements of the quality control system of DSTU ISO 9001-95 is described. The quality strategy is based on a maximum satisfaction of requirements of the customer in conductance of tests to obtain the objective estimate
Keywords: certification, welding equipment, quality sys tem. control and testing, procedures of quality control
References
1. DSTU ISO 9001-95. Model of quality assurance in designing, development, manufacture, assembly and maintenance. Filed 11.09.95.2. COST 24297- 87. Incoming inspection of producls. Filed 01.01.88.
3. Instruction P 7. About rules of acceptance of industrial products and consumer goods by quality. Filed 25.04.66.
4. Kopilenko, E.A., Pavlenko, G.V., Samokhina, T.l. et al. (2001) Metrological assurance of serial production of welding equipment of «SELMA» Company and its conformity to the requirements of DSTU ISO 9001-95. Avtomaticheskaya Swarka, 5, 23- 25.
