Technical Diagnostics and Non-Destructive Testing #3, 2022, pp. 35-41

Performance of hydraulic testing of piping of heat networks to achieve the specified reliability of their operation

V.M. Torop


ІE.O. Paton Electric Welding Institute of NASU. 11 Kazymyr Malevych str., 03150, Kyiv, Ukraine. E-mail: office@paton.kiev.ua

Factors affecting the operational reliability of heat networks during periodical hydraulic testing (pressure testing) by higher pressure. Analysis of damage of Kiev heat network piping during 2002 – 2017 has been performed and deficiencies of normative documents have been noted as regards the procedure of performance of periodical hydraulic testing by higher pressure. Influence of defects has been considered and an approach has been proposed for determination of testing pressure, in order to achieve the specified reliability of operation of pipelines with defects. Ref. 14, Fig. 4.
Keywords: heat networks, piping, hydraulic testing, fracture, corrosion, defects, reliability

Received: 12.07.2022

References

1. (2018) Determination of high pressure influence on metal properties in heating system pipelines during hydraulic tests with provision of recommendations concerning the value of test pressure levels depending on service conditions. In: Technical report. Kyiv, PWI [in Ukrainian].
2. (2020) Investigation of causes of fracture in a section of main hot water system of 1020 mm diameter from the accident site at 176 Antonovych Str.
3. Dmytrienko, R.I., Yukhymets, P.S., Torop, V.M. et al. (2020) Damageability and effectiveness of conducting hydraulic testing of heating systems of Kyiv city. Tekh. Diagnost. ta Neruiniv. Kontrol, 1, 37-44. [in Ukrainian]. https://doi.org/10.37434/tdnk2020.01.04
4. Chicherin, S.V. (2022) Improvement of centralized heating system at reconstruction and operation of heating networks. In: Syn. of Thesis for Cand. of Tech. Sci. Degree, OSTU [in Russian].
5. (2017) Instruction No. 29: Testing of heating systems for hydraulic density. Kyiv, PAT Kyivenergo, SVP Kyiv heating networks [in Ukrainian].
6. (2017) Program of hydraulic density testing of water supply systems ТМ-1, 2, 8 of RTM Pechersk of SVP KTM from HPP-5 in 2017.
7. (2007) Rules of technical operation of heat plants and networks. Appr. 14.02.2007, № 71. Ministry of Fuel and Energy of Ukraine. Kharkiv, Industriya [in Ukrainian].
8. (2003) GKD 34.20.507-2003: Technical operation of electric power plants and heating systems. Rules. Approv. 13.06.2003, № 296. Kyiv, Ministry of Fuel and Energy of Ukraine [in Ukrainian].
9. (1997) GKD 34.20.504-94: Heating systems. Operating instructions. Kyiv, Research Institute of Energy [in Ukrainian].
10. Murtazin, I.I., Timchenko, S.V. (2013) Pressure tests using vehicles. Novosti Teplosnabzheniya, 10(158) [in Russian]. http://www.ntsn.ru/10_2013.html
11. Torop, V.M. (2005) Probabilistic risk-analysis of operation of pipeline systems, tanks and pressure vessels. Information 1: Algorithm for construction of the probabilistic model. Problemy Mitsnosti, 2, 85-91 [in Ukrainian]. https://doi.org/10.1007/s11223-005-0030-1
12. Torop, V.M. (2005) Probabilistic risk-analysis of operation of pipeline systems, tanks and pressure vessels. Information 2: Method of evaluation of fitness-for-purpose of structural elements using limited data. Ibid., 3, 96-103 [in Ukrainian]. https://doi.org/10.1007/s11223-005-0042-x
13. (2004) Recommended practice for corroded pipelines DNVRP-F101.
14. Kiefner, J.F. (2001) Role of hydrostatic testing in pipeline integrity assessment. Northeast Pipeline Integrity Workshop, Albany, New York, June 12.