Eng
Ukr
Rus
Print

2021 №03 (04) DOI of Article
10.37434/tdnk2021.03.05
2021 №03 (06)

Technical Diagnostics and Non-Destructive Testing 2021 #03
Technical Diagnostics and Non-Destructive Testing #3, 2021, pp. 37-43

Quality control of welded structures based on a system of inspection and technological regulation of their fabrication, in keeping with the requirements to DSTU ISO 9001:2015

Yu.K. Bondarenko, A.G. Potapyevskyi, K.O. Artyukh, Yu.V. Loginova


E.O. Paton Electric Welding Institute of the NAS of Ukraine 11 Kazymyr Malevych Str., 03150, Kyiv, Ukraine. E-mail: office@paton.kiev.ua

In keeping with DSTU ISO 9001:2015 standard, an organization should develop, document, introduce and maintain in the working condition a system of quality management, and should constantly improve its effectiveness, in keeping with the requirements of the actual standard.
Keywords: quality management system, quality control system, normative documents, welded structure, nondestructive testing, technical diagnostics, welding fabrication

Received: 20.05.2021

References

1. Bondarenko, Yu.K., Potapievskyi, A.G., Loginova, Yu.V., Artyukh, K.O. (2020) Analysis and procedures of standardization, accreditation, metrology and examination of welding production. Kyiv [in Ukrainian].
2. DSTU ISO 19011:2019 (ISO 19011:2018, IDT): Guidelines for auditing management systems [in Ukrainian].
3. Bondarenko, Yu.K., Potapievskyi, A.G., Loginova, Yu.V., Artyukh, K.O., Kovalchuk, O.V., Saenko, V.V. (2020) Risk management in welding production. Kyiv [in Ukrainian].
4. Bondarenko, Yu.K., Artyukh, K.O. (2021) Examination of the problem of quality management and development of a system for inspection and regulation of production of light alloy welded structures. In: Proc. of Int. Sci. and Techn. Seminar on Current Problems of Production and Repair in Industry and Transport (15-19 March 2021, Lviv), 14–17 [in Ukrainian].

Advertising in this issue: